Stellenbosch — The Public Record

Decisions, money, promises and services in Stellenbosch Local Municipality, 2021–2026. Sourced, classified, correctable.

Document SRC-2011

MPT decision letter: subdivision and departure, Farm No. 81/29, Stellenbosch Division, application LU/13517

Stellenbosch Municipality (Directorate Planning and Economic Development) · 11 May 2022 · planning decision letter (scanned PDF)

Original address
https://web.archive.org/web/20240703185102id_/https://stellenbosch.gov.za/download/decision-letter-farm-81-29-stellenbosch-2/?ind=1652279935051&filename=FARM-81-29-STELLENBOSCH.MPT-DECISION-LETTER.pdf&wpdmdl=17790&refresh=6419b799d03811679407001
Retrieved
29 October 2026
Archived copy
An archived copy is held by the project
Why it matters
MPT approval of the Farm 81/29 layout (119 group housing erven and a 60-unit block of flats) with a quantified inclusionary housing condition and reasons citing ATC Precinct 10.

Original document

Open the original ↗ (opens in a new tab)
Retrieved 29 October 2026.

Cited pinpoints: PDF p.1 (resolution 22 Apr 2022; items 2.1-2.1.1(d)), PDF p.2 (item 2.2; 'BE APPROVED'), PDF p.4 (conditions 3.15-3.16; reasons 4.1-4.3), PDF p.7 (signature date 11/5/2022)

No extracted text available for this document.

Claims citing this document

  • VerifiedEditor-approved On 22 April 2022 Stellenbosch Municipality's Municipal Planning Tribunal approved, under application LU/13517, the subdivision of Farm 81/29 into 119 Multi-Unit Residential erven for group housing, one erf for 'a block of flats consisting of 60 units', private open space and a private road, and a departure to exceed the maximum density 'of 50 dwelling units per hectare to 60 dwelling units per hectare'. Condition 3.15 requires the developer and the municipality to agree, within 12 months of final notification and before building plans are submitted, on inclusionary housing of 'no less than 30% falling within the affordability thresholds for rental and/or ownership'. Condition 3.16 gives the developer the option 'but no obligation' to follow the Inclusionary Zoning Policy instead, if adopted. The reasons state the plan is in line with 'Precinct 10' of the Adam Tas Corridor on density. (PDF p.1 (resolution 22 Apr 2022; items 2.1-2.1.1(d)), PDF p.2 (item 2.2; 'BE APPROVED'), PDF p.4 (conditions 3.15-3.16; reasons 4.1-4.3), PDF p.7 (signature date 11/5/2022))

Used in investigations