Stellenbosch — The Public Record

Decisions, money, promises and services in Stellenbosch Local Municipality, 2021–2026. Sourced, classified, correctable.

Document SRC-2004

MPT decision letter: Erf 7001, Stellenbosch (Hendrickse Street, Cloetesville), application LU/16572 (TP591/2023), with annexures incl. Infrastructure Services memo of 5 Aug 2024

Stellenbosch Municipality (Municipal Planning Tribunal; Directorate Planning and Economic Development) · 2 December 2024 · planning decision letter (scanned PDF, 20 pp)

Original address
https://web.archive.org/web/20250418130828id_/https://stellenbosch.gov.za/download/decision-letter-erf-7001-stellenbosch/?ind=1733223197658&filename=DECISION-LETTER-ERF-7001-STELLENBOSCH.pdf&wpdmdl=25854&refresh=68024ccb1b9551744981195
Retrieved
29 October 2026
Archived copy
An archived copy is held by the project
Why it matters
Primary record of the approval of the municipal GAP housing project on Erf 7001: what was approved, the reasons, and the infrastructure conditions and their funding status.

Original document

Open the original ↗ (opens in a new tab)
Retrieved 29 October 2026.

Cited pinpoints: PDF p.1 (resolution 29 Nov 2024; items 1.1-1.3.1), PDF p.2 (items 1.3.2-1.5; 'BE APPROVED'), PDF p.4 (reason 3.1), PDF p.6 (signature date 2/12/2024)PDF p.15 (printed p.793; memo header, parking departure), PDF p.16 (printed p.794; water, funding), PDF p.17 (printed p.795; sewer, funding; roads item 3.1.1)

No extracted text available for this document.

Claims citing this document

  • VerifiedEditor-approved Stellenbosch Municipality's Municipal Planning Tribunal resolved on 29 November 2024 to approve application LU/16572 for Erf 7001, Hendrickse Street, Stellenbosch (Cloetesville): closure of part of a public place, rezoning from Public Open Space Zone to Subdivisional Area Overlay Zone, and subdivision into 208 erven, of which Erf 1 to Erf 201 are Conventional Residential erven of about 115-312 m² (about 3.32 ha in total). It also approved building-line departures and consent for a telecommunications mast. The stated reason is that the municipality needs the property for an integrated urban settlement development 'with a particular goal to deliver on their mandate to provide medium to upper market housing opportunities'. The decision letter is signed for the Director: Planning and Economic Development and dated 2 December 2024. (PDF p.1 (resolution 29 Nov 2024; items 1.1-1.3.1), PDF p.2 (items 1.3.2-1.5; 'BE APPROVED'), PDF p.4 (reason 3.1), PDF p.6 (signature date 2/12/2024))
  • VerifiedEditor-approved Approved figure (not delivery) In a memo of 5 August 2024 annexed to the Erf 7001 decision letter, Stellenbosch Municipality's Infrastructure Services set conditions to be met before transfer of the first property or approval of building plans: a new 7.0 ML Cloetesville Reservoir and pump upgrades, for which it says R22 million (excluding VAT) is on the 2024/25-2026/27 budget for 'Bulk water supply pipe: Cloetesville / Idas Valley'; a bulk sewer line from Kayamandi to Merriman Street, about which it says: 'Currently this project is not on the municipal budget. Budget should therefore be allocated to unlock this housing project.'; and an extended turning lane at the R44/Hendrickse intersection. It did not support the parking departure because 'Row housing is not supported by the Infrastructure Directorate, specifically for stormwater drainage reasons'. (PDF p.15 (printed p.793; memo header, parking departure), PDF p.16 (printed p.794; water, funding), PDF p.17 (printed p.795; sewer, funding; roads item 3.1.1))

Used in investigations